A gate in your tender.
A requirement in our build.
S.O. 3962(E) makes accessibility conformance a condition of government procurement of software. Most vendors in this market have not noticed yet. We are building for the gate before it is enforced, not after.
In the product today
Practices, not
a settings toggle.
Operable
- Keyboard reachability as a review requirement, not an afterthought
- Visible focus indication throughout — no hover-only affordances
- No flashing content; motion never carries meaning alone
Perceivable
- Reduced-motion preference honoured — animated surfaces ship a complete static alternative
- Screen-reader semantics: labelled controls, transcripts for animated content
- Contrast held against WCAG targets in the design system itself
For every family
- Regional-language parent messaging — accessibility includes language
- Low-bandwidth tolerance: the parent app assumes 2G days happen
- Print and PDF outputs remain readable without colour
What a tender asks for
The procurement fact
From 2026, government buyers must ask. We intend to be the easy answer.
S.O. 3962(E) — issued under the Rights of Persons with Disabilities Act — makes accessibility conformance a condition of government procurement of ICT, with a dual-format Accessibility Conformance Report as the evidence. For education software this changes who can sell to government and aided institutions at all: a vendor without conformance reporting is not cheaper or slower, it is ineligible. The eighteen-month compliance clock is running for the whole industry.
Our position is stated plainly: accessibility is being engineered into the platform as a requirement with the ACR as its output, and conformance documentation is prepared for tender processes on request. Where a criterion is not yet met, the report says so — an ACR that hides its gaps fails the audit that follows the tender, and we would rather lose a tender than a customer. If your procurement needs the current documentation, ask for it in the demo session and it comes with its date on it.
Tendering?
Ask for the documentation.
Conformance reporting, dated, with its gaps stated — the way an auditor wants it.